278 Works for Passing Bays in Wetherden

Client: MAB Building Solutions Ltd
Project Type: Highway Improvement – Passing Bays
Location: Wetherden, Suffolk

Project Overview

CS Mason Contracts was commissioned by MAB Building Solutions to deliver 278 highway works involving the construction of two passing bays along a single-track lane in Wetherden. The project aimed to improve traffic flow and safety along this stretch of road, ensuring compliance with local highway standards.

Scope of Works

The works included:

  • Site setup with welfare and traffic management

  • Installation of MOT Type 1 sub-base

  • Engineer-led pin setting for kerb runs

  • Surfacing of the passing bays

  • Bank grading and landscaping

  • Additional patching works to the lane

Project Highlights

  • Full adherence to adoptable highway standards under Section 278 works

  • Precision engineering to ensure alignment, stability, and durability

  • Collaboration with MAB Building Solutions and Iceni Consulting for high-standard project drawings and planning

  • Efficient delivery while minimizing disruption to local traffic

Outcome

The passing bays are now fully surfaced, with all banks graded back and lane patching completed. The project has successfully improved road safety and accessibility while demonstrating the capability of CS Mason Contracts to deliver complex highway works efficiently and to specification.

Key Takeaways

  • Expert planning and execution ensure highway improvements are safe and durable

  • Collaboration with the client and design consultants is vital for success

  • CS Mason Contracts can deliver turnkey 278 works projects, from site setup to completion

Scroll to Top